Skip to main navigation Skip to search Skip to main content

A note on “A constraint programming-based lower bounding procedure for the job shop scheduling problem”

  • Francisco Yuraszeck (Correspondent Author)
  • , Gonzalo Mejía (Second Author)
  • , Daniel Alejandro Rossit (Third Author)
  • , Armin Lüer-Villagra (Fourth Autor)
  • Universidad Andrés Bello
  • Universidad Nacional del Sur

Research output: Contribution to journalArticlepeer-review

1 Scopus citations

Abstract

In Yuraszeck et al. (2025), we recently proposed a constraint programming (CP) lower-bounding procedure for the minimal makespan job shop scheduling problem (JSSP). This approach consisted of two phases: in the first phase, a relaxation of the original problem is solved, while in the second phase, this relaxation is iteratively tightened until a time limit is reached or no better bounds are found. In this paper, we introduce a third phase, that iteratively solves the subproblems left unaddressed in the second phase. Additionally, we evaluate the influence of warm-starting the algorithm on solution quality and computational time. We tested our updated procedure on 80 open JSSP instances, finding 14 new lower bounds with an average reduction in the optimality gap of 29.59% compared with the best-known bounds from the literature.

Original languageEnglish
Article number107396
JournalComputers and Operations Research
Volume189
DOIs
StatePublished - May 2026

Strategic Focuses

  • Sociedad Digital y Competitividad​ (SocietalIA)

Article Classification

  • Full research article

Indexación Internacional (Artículo)

  • ISI Y SCOPUS

Scopus-Q Quartil

  • Q1

ISI- Q Quartil

  • Q1

Categoría Publindex

  • A1

Fingerprint

Dive into the research topics of 'A note on “A constraint programming-based lower bounding procedure for the job shop scheduling problem”'. Together they form a unique fingerprint.

Cite this