Ir directamente a la navegación principal Ir directamente a la búsqueda Ir directamente al contenido principal

A note on “A constraint programming-based lower bounding procedure for the job shop scheduling problem”

  • Francisco Yuraszeck (Autor Corresponsal)
  • , Gonzalo Mejía (Segundo Autor)
  • , Daniel Alejandro Rossit (Tercer Autor)
  • , Armin Lüer-Villagra (Cuarto Autor)
  • Universidad Andrés Bello
  • Universidad Nacional del Sur

Producción científica: Contribución a una revistaArtículorevisión exhaustiva

1 Cita (Scopus)

Resumen

In Yuraszeck et al. (2025), we recently proposed a constraint programming (CP) lower-bounding procedure for the minimal makespan job shop scheduling problem (JSSP). This approach consisted of two phases: in the first phase, a relaxation of the original problem is solved, while in the second phase, this relaxation is iteratively tightened until a time limit is reached or no better bounds are found. In this paper, we introduce a third phase, that iteratively solves the subproblems left unaddressed in the second phase. Additionally, we evaluate the influence of warm-starting the algorithm on solution quality and computational time. We tested our updated procedure on 80 open JSSP instances, finding 14 new lower bounds with an average reduction in the optimality gap of 29.59% compared with the best-known bounds from the literature.

Idioma originalInglés
Número de artículo107396
PublicaciónComputers and Operations Research
Volumen189
DOI
EstadoPublicada - may 2026

Focos Estratégicos

  • Sociedad Digital y Competitividad​ (SocietalIA)

Clasificación de Articulo

  • Artículo completo de investigación

Indexación Internacional (Artículo)

  • ISI Y SCOPUS

Scopus-Q Quartil

  • Q1

ISI- Q Quartil

  • Q1

Categoría Publindex

  • A1

Huella

Profundice en los temas de investigación de 'A note on “A constraint programming-based lower bounding procedure for the job shop scheduling problem”'. En conjunto forman una huella única.

Citar esto